Industrial Recycling Plant

Industrial Recycling Plant, St, Albans

For this job, JPEC was required to reinstate power to a site following a spate of copper thefts.

We arranged for a quick reconnection of their main power system to ensure minimal loss of time.

We were very happy with the end result, as the job was completed ahead of schedule, and below initial cost estimates, which translated to savings for our client.